The plumbers came back today and put in the water lines. These lines run in the slab and come out at specific places. After framing, more water lines will be put in through the walls to all the places that need water (faucets, tubs, etc.).
We got an inspection on the drain lines and the water lines and passed. Yay. Now we can move on with the slab.
.jpg)
.jpg)
.jpg)
No comments:
Post a Comment